Facebook Twitter LinkedIn YouTube Menu Search Arrow Right Arrow Left Arrow Down Arrow Up Home Arrow Next Arrow Previous RSS Icon Calendar Icon Warning Icon
NOTICE: EASA’s office will be closed on Friday, March 29, 2024 in observance of Good Friday.

Filter the results

  • Enter one or more words to find resources containing any of the words entered
  • Enter words or phrases between " " to find exact match

Resource Library

Article

Guidelines for vertical pump removal and installation

  • February 2015
  • Number of views: 8335
  • Article rating: 5.0

Gene Vogel
EASA Pump & Vibration Specialist

Service centers that provide field service for equipment removal and installation have little trouble handling most common horizontal pumps. However, vertical turbine pumps (and similarly mounted vertical pumps) present some additional challenges. Vertical pumps of this style use the discharge column to suspend the pump below grade from a grade mounted discharge casing. The casing provides the support for the pump, the pedestal for the vertical drive motor, and a 90 degree discharge elbow. The discharge elbow may be above or below grade.

The initial challenge for pump removal is presented by the length of the pump. Short set pumps range to about 50 ft. (15 meters) in overall length, minus the drive motor. Deep set pumps can extend hundreds of feet (or meters) into a well or sump. The designation as short set or deep set is somewhat arbitrary, depending on the working height of the available crane to lift the machine. A short set pump could be handled as a single piece (again, less the motor). But if the length of the pump exceeds the working height of the crane, then field disassembly is necessary – usually referred to as a deep set pump.

Topics covered include:

  • Documenting the condition of the machine
  • Overhead clearances
  • Reinstalling the pump
  • Tests

LOGIN TO DOWNLOAD THE ARTICLE



Rate this article:
5.0
Print


PREVIOUS ITEM
Comments are only visible to subscribers.

Getting The Most From Your Electric Motors

Getting The Most From Your Electric Motors - coverThis 40-page booklet provides great advice for obtaining the longest, most efficient and cost-effective operation from general and definite purpose electric motors.

This booklet covers topics such as:

  • Installation, startup and baseline information
  • Operational monitoring and maintenance
  • Motor and baseline installation data
  • How to read a motor nameplate
  • Motor storage recommendations

LEARN MORE AND DOWNLOAD MÁS INFORMACIÓN Y DESCARGAR BUY PRINTED COPIES

READ MORE ABOUT THE FEATURES AND BENEFITS

EASA/AEMT Rewind Study

EASA Rewind Study cover

The Effect of Repair/Rewinding on Premium Efficiency/IE3 Motors
Tests prove Premium Efficiency/IE3 Motors can be rewound without degrading efficiency.

DOWNLOAD THE FULL RESULTS

ANSI/EASA AR100-2020

ANSI/EASA AR100-2015 cover

Recommended Practice for the Repair of Rotating Electrical Apparatus
This is a must-have guide to the repair of rotating electrical machines. Its purpose is to establish recommended practices in each step of the rotating electrical apparatus rewinding and rebuilding processes.

DOWNLOAD - ENGLISH

DESCARGAR - ESPAÑOL

EASA Technical Manual

EASA Technical Manual cover

Revised September 2022
The EASA Technical Manual is the association's definitive and most complete publication. It's available FREE to members in an online format. Members can also download PDFs of the entire manual or individual sections.

VIEW & DOWNLOAD